PA HOUSE DISTRICT 132 · SOUTH WHITEHALL · PARKLAND · UPPER MACUNGIE · ALLENTOWN

We are fighting all data centers.

Pennsylvania already has an estimated 101 active data centers, with dozens more proposed statewide — not just here. They're driving up everyone's electric bill, and once one is built next to a neighborhood or a school, there's no undoing it. Caren Lowrey is a lifelong South Whitehall resident, a Parkland graduate, a mother of three, and a drug prevention specialist running for State Representative to stop it, alongside lower costs, stronger schools, student safety, and accountability.

101 active data centers statewide
With dozens more moving through local planning processes across Pennsylvania right now.
Joint State Government Commission, via City & State PA
$213 → $257 avg. monthly electric bill
Up in just two years, with data-center power demand cited as a major driver of the regional cost surge.
PA Independent Fiscal Office
$20B Amazon buildout, 2 counties
Two hyperscale campuses planned for Luzerne and Bucks counties — one company, one state.
City & State PA
3+ counties already fighting back
Cumberland, Montour, and Luzerne counties all have active local opposition — this isn't a South Whitehall-only problem.
City & State PA

Why this can't just be a local fight

The bill that helps build them isn't local either.

House Bill 502 wouldn't just affect one township — it would create a state board with the power to approve data-center power facilities anywhere in Pennsylvania and override local zoning entirely. Mike Schlossberg co-sponsored it. At a May 2026 public forum on data centers, he said plainly: "I don't think a moratorium is appropriate from an economic or from an infrastructure development perspective." He didn't propose a pause — he said no to one, then backed the bill that clears the way for more of these, in every district, including yours.

Right here at home

The Atlas data center: our neighborhood's version of it.

Every one of these fights has a local face. Ours is the Atlas data center — a hyperscale proposal directly across Route 309 from Parkland High School, down from an original 5.1 million sq ft to roughly 1.5 million sq ft after community pushback, with a planning commission decision still pending. Caren has fought it since before she was a candidate for anything.

See her full record on it →
Illustrative site plan: Parkland High School and the proposed Atlas data center Simplified, not-to-scale diagram showing Parkland High School across Route 309 from the proposed Atlas data center buildings. SITE PLAN — SOUTH WHITEHALL TWP, PA ILLUSTRATIVE / NOT TO SCALE PARKLAND HIGH SCHOOL ROUTE 309 ATLAS DATA CENTER — PROPOSED 3 buildings · approx. 1.5M sq ft
Illustrative diagram, not drawn to precise scale. Full sources → Atlas Data Center page

Where she stands

Stopping data centers, and three more priorities.

Keeping decisions and dollars close to the people they affect — in South Whitehall, Parkland, Upper Macungie, and Allentown alike.

Lower Costs

Cut energy costs, ease the tax burden on working families and small businesses, and improve price transparency.

Read more

Stronger Schools

Support teachers, strengthen parent involvement, and build real career pathways for students.

Read more

Student Safety

Prevention and mental-health support from someone who does this work professionally, every day.

Read more

Accountability

Transparency, responsible spending, and real oversight — in government and in schools.

Read more
Caren Lowrey in a school library in South Whitehall Township, Pennsylvania
Caren in one of the schools she works in as a drug prevention and education specialist.

Who's fighting for you

A neighbor first. A candidate second.

Caren works every day as a drug educator and prevention specialist in Lehigh Valley schools, sits on the Lehigh County Drug and Alcohol Advisory Board, and is a certified recovery specialist in long-term recovery herself. Her family has run a local coffee-service business serving Lehigh Valley workplaces since 1988.

She's running for State Representative because the people making decisions about her district shouldn't be strangers to it — whether that's a data center in South Whitehall or a school budget in Parkland.

Meet Caren

Show up on September 23.

The Planning Commission meets again at Parkland High School to review the Atlas data center. This is the moment residents' questions get answered on the record — or don't.